Skip to content

Plans and Projects

Our vision is to create a better place to live, built on transportation excellence. Guided by our regional transportation strategy, we work to connect the region and enhance its livability by providing a sustainable transportation system network.

Explore all plans and projects

Featured Projects

Bus Rapid Transit is Coming

A conceptual illustration of a Bus Rapid Transit (BRT) system showing a modern bus in a designated bus lane approaching a station with waiting passengers.

The initial three high-frequency Bus Rapid Transit service corridors with dedicated bus lanes and rail-like stations in Metro Vancouver have been selected for further planning.

Expo Line Elevator Replacement Project

Expo Line elevators at Burrard Station are out of service while being replaced. Alternative routes are available.

Battery Electric Buses Expansion

We’re installing on-route chargers for our battery-electric fleet starting with Port Coquitlam station in June 2026.

LIM Rail Replacement Program

SkyTrain travelling through Dunsmuir tunnel with track in foreground

Weekend service on the Expo Line will have early morning and late evening disruptions between Waterfront and Commercial–Broadway stations until fall. Riders should plan for up to 20 extra minutes travel time.

R2 Marine-Willingdon RapidBus

RapidBus on Marine Drive surrounded by moving traffic

Starting September 2026, the R2 Marine Drive RapidBus will be extended from Phibbs Exchange to Metrotown Station via Hastings Street and Willingdon Avenue.

SkyTrain Expansion: Expo Line Service Changes

New maintenance facility for SkyTrain

Expect significant service changes to Expo Line beginning Feb. 25, 2024, when travelling to Production Way-University, Lougheed Town Centre, Braid, and Sapperton SkyTrain stations.