Transit Service Changes

 

Four times a year (April, June, September and December), TransLink performs a round of service changes to optimize service and increase efficiencies.

All the changes listed below take effect on April 15, 2013 except where noted otherwise. Some changes are seasonal while others are temporary due to construction.

Click on the station or route name/number below to find out what changes are happening and to access updated timetables, stop information and route/station diagrams.

 

4 UBC/Downtown

Temporary

Due to preparation for Powell Street construction, downtown trips will operate between UBC and Waterfront Station only until summer 2014 as follows:

  • Customers travelling further east from Waterfront Station need to transfer from 4 Downtown to 4 Powell Shuttle at the stop located on the south side of Cordova Street at Seymour Street.
  • Customers travelling further west from Waterfront Station need to transfer from the 4 Downtown Shuttle to the 4 UBC at the stop located on the south side of Cordova Street at Seymour Street.

Shuttle service will operate approximately every 15 minutes and a little less frequent in the evening.

4 UBC/Downtown
4 Reroute Map

4 Powell/Downtown

Temporary

Due to preparation for Powell Street construction, a shuttle will operate between Waterfront Station and Renfrew Street terminus (Renfrew Street at Eton Street) only until summer 2014 as follows:

  • Customers travelling further east from Waterfront Station, need to transfer from 4 Downtown to 4 Powell Shuttle at the stop located on the south side of Cordova Street at Seymour Street.
  • Customers travelling further west from Waterfront Station need to transfer from the 4 Downtown Shuttle to the 4 UBC at the stop located on the south side of Cordova Street at Seymour Street.

Shuttle service will operate approximately every 15 minutes and a little less frequently in the evening.

4 Powell Shuttle
4 Reroute Map

9 Alma/Granville/Commercial/Broadway Stn/Boundary

Seasonal

Monday-Friday: morning and afternoon peak periods between Alma Street and UBC will be temporarily discontinued until September.

Customers can use the 99 B-Line service for travel to and from UBC.

9 Alma/Granville/Commercial/Broadway Stn/Boundary

10 Downtown/Granville

Temporary

Due to construction, 10 Downtown/Granville service between Marpole Loop and Marine Drive Station will be discontinued.

Customers need to board the 100 22nd Street Station/Marpole Loop for service between the loop and station.

10 Downtown/Granville
10 Reroute Map

25 Brentwood/UBC

Seasonal
Monday-Friday
  • Buses will operate 10 minute service between 6-9 a.m.
  • Morning peak period trips leaving King Edward Av./Granville St. at 7:19, 7:27 and 7:35 a.m. (destined for BCIT) will be discontinued until September 2013.

25 Brentwood/UBC

28 Joyce/Phibbs Exchange

Seasonal

Capilano University trips will be discontinued until September.

Customers travelling between Phibbs Exchange and Capilano University can use the 239 Capilano University/Park Royal.

28 Joyce Station/Phibbs Exchange

44 UBC/Downtown

Seasonal

Monday-Friday: Buses will operate every 10 minutes between 6-9 a.m., and every 15 minutes between 3-6 p.m.

44 UBC/Downtown

125 Patterson Stn/BCIT

Seasonal

Service will operate until May 24, 2013, then discontinued until September 2013.

Customers are encouraged to use the frequent 130 Metrotown/Hastings/Kootenay/Phibbs Exchange route from Metrotown or Brentwood SkyTrain Stations for travel to and from BCIT.

125 Patterson Stn/BCIT

130 Metrotown Stn/Hastings/Phibbs Exchange

Seasonal

Capilano University trips will be discontinued until September.

Customers travelling between Phibbs Exchange and Capilano University can use the 239 Capilano University/Park Royal.

130 Metrotown Stn/Hastings/Phibbs Exchange

143 SFU/Coquitlam

Seasonal

Monday-Friday: trips will operate every 12 minutes.

The last trip will now leave SFU at 7:37 p.m.

143 SFU/Coquitlam

150 White Pine Beach/Coquitlam Station

Seasonal

Monday-Friday: Bus service to White Pine Beach will operate June 10 to August 30, 2013.

Saturdays, Sundays and holidays: Bus service to White Pine Beach will operate May 4, 2013 until Labour Day (September 2, 2013).

150 White Pine Beach/Coquitlam Station

480 Bridgeport Station/UBC

Seasonal

Monday - Friday:

  • Morning peak period buses will operate every 10 minutes.
  • Midday and afternoon peak period buses will operate approximately every 15-30 minutes.
  • Early evening buses will run every 30 minutes, with the last trip leaving UBC Loop at 7:40 p.m. and the last trip leaving Bridgeport Station at 6:55 p.m.

480 Bridgeport Station/UBC

C26 Buntzen Lake/Coquitlam Station (Special)

Seasonal

Beginning June 15, 2013 until Labour Day (September 2, 2013), service will resume to Buntzen Lake with trips operating on weekends and holidays.

C26 Buntzen Lake/Coquitlam Station (Special)

Marpole Loop

Temporary
  • 10 Downtown service will use bay #1
  • 100 22nd Street Station/Marpole Loop will use bay #2

Marpole Loop Map

Newton Exchange

Temporary

Due to construction, the bus bays have been temporarily relocated and the number of bays have been reduced from 8 to 5 until summer 2013.

Newton Exchange Map

SeaBus

Seasonal

Sunday and holidays: beginning May 19, 2013 until Labour Day (September 2, 2013), SeaBus service will increase to 15 minutes between 10 a.m. and 7 p.m.

Transit Alerts

user reading mobile message on transit
alert icon Not sure if your ride is on time?

Get Transit Alerts on your cell phone or by email and we'll keep you up to date.