2017 Pedestrian Transit Access Improvement Works Pedestrian New sidewalk and sidewalk widening. 2017 $10,000
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Guard Rails Road Installation road guard rails at various locations on MRN roads, over a 3 year period (2018 to 2020 inclusive) in order improve safety. 2018 $63,750
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Cross Island Multi-Use Path Phase 1 Cycling 2.5 m-wide multi-use path. 2017 $180,000
Bike Barn Cycling The project located at the gateway and transportation hub of the island, will provide shelter and secure parking facilities for cyclists connecting to the ferry, bus, and commercial and community core of Bowen. 2018 $18,000
Spirit Trail Wayfinding Cycling Project to help improve safety, navigation, enjoyment, and sense of place of the Bowen Island portion of the North Shore Spirit Trail. Particular emphasis on quality wayfinding because this will be the first section dedicated to active transportation. 2018 $15,000
The Cardena Drive Pedestrian Improvement Project Pedestrian Bowen Island's busiest transit exchange will receive paved landing pads, tactile walking surface indicators, a multi-use path and proper curb letdowns and bulges to effectively and safely facilitate active transportation and mitigate vehicular conflicts. 2018 $231,025
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Lougheed Highway Sidewalk Construction Road Pedestrian improvements on Lougheed Highway between Douglas Road and Holdom Avenue. 2012 $150,000
Lougheed Highway Streetlights Construction Road Road safety improvements on Lougheed Highway between Douglas Road and Sperling Avenue. 2012 $300,000
Burnaby Uninterrupted Power Supply Installation Road Uninterrupted Power Supply Installation at 27 locations on the MRN. 2012 $76,250
Nelson - Royal Oak Urban Trail Improvement Project Cycling New multi-use pathway along Nelson Avenue between Bennett Street and BC Parkway. 2012 $163,500
Sea to River Bikeway - Gilmore Urban Trail Section Improvement Project Cycling New multi-use pathway on Gilmore Diversion between Still Creek Drive and Canada Way. 2014, 2015 $779,800
Willingdon Linear Park Cycling linear park and 4.0 m-wide multi-use path over a 1.3 km segment. 2017 $1,740,200
Rumble Street Upgrade Project Cycling 3.0 m-wide multi-use path over a 1.1 km segment. 2017 $475,000
North Road UPS Installation Road Installation of UPS at 7 signalized intersections along North Road which will improve corridor operations by reducing disruptions caused by power outages. 2018 $13,320
Lougheed Highway Upgrades - Gaglardi to Austin Cycling Lougheed Highway upgrades from Gaglardi Way to Austin Road. 2018 $3,469,680
Beresford at Gilley Trail Crossing Improvements Cycling Safety improvements for the Highland Park Line Trail crossing at Gilley Avenue adjacent to Beresford Street by installing a pedestrian/cyclist activated signal. 2018 $95,000
Deer Lake Avenue Improvements Cycling Project to upgrade Deer Lake Avenue from Deer Lake Parkway to Kensington Ave in 2018/2019 to include enhanced walking and cycling facilities, safer crossings and typical urban design features. 2018 $711,000
Rumble Street Upgrade Project Phase 3 Cycling Rumble St Upgrade project (McKay Ave to Royal Oak Ave) linking the recently completed section to the west. 2018 $400,000
Lougheed Highway Upgrades - Boundary to Gilmore Cycling Lougheed Highway upgrades from Boundary Road to Gilmore Avenue. 2018 $600,000
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Clarke Road Transportation Improvement Project - between Cottonwood Avenue and Kemsley Avenue Road Intersection improvements on Clark Road at Cottonwood Avenue and Kemsley Avenue. 2012 $692,500
Coquitlam Uninterrupted Power Supply Installation Road Traffic signal improvements at 10 intersections in Coquitlam. 2012 $41,720
Poirier Street Multi-Use Pathway Cycling New multi-use pathway and roadway improvements on Poirier Street between Foster Avenue and Regan Avenue. 2012 $92,400
Pinetree Way Revitalization Project Cycling New multi-use pathway along the Evergreen Line Guideway alignment between Barnet Highway and Town Centre Boulevard. 2014, 2015 $460,800
Barnet Highway Bike Route Improvement Project Cycling Bicycle improvements on Barnet Highway between Pinetree Way and Balmoral Drive. 2016 $115,000
Barnet (Hwy 7A) / Lansdowne Intersection Upgrade Road Reconfiguration of turn lanes and intersection improvements for cyclists. 2017 $80,000
UPS Installations Road Installation of uninterrupted power supplies at 15 intersections on the MRN. 2017 $64,000
Dogwood Fairview Greenway Cycling 3.0 m-wide multi-use path on Denton Street; neighborhood bike route on Appian Way, Fairview Street and Dogwood St; cyclist-actuated signal at Como Lake Avenue and Dogwood Street. 2017 $280,000
Lougheed Hwy - Sidewalk Construction Project Pedestrian 1.5 m-wide protected sidewalk. 2017 $185,300
Guildford Way Crosswalk for Coquitlam Crunch Pedestrian Installation of Coquitlam Crunch crosswalk at Guildford Way to provide a convenient and safe pedestrian and cyclist crossing point. 2018 $106,500
Hillcrest Como Lake Greenway Cycling This project involves the creation of a Citywide Greenway along Hillcrest St. (from Austin Ave. to Como Lake) and an enhancement of the existing multi-use pathway along the south side of Como Lake Ave. from Thermal Dr. to Mariner Way. 2018 $890,000
Lougheed Highway Improvements Cycling The Lougheed Highway Improvements project consists of a variety of roadway and intersection safety features, and off-street cycling enhancements. 2018 $1,725,820
North Road UPS installations Road Installation of UPS at 7 signalized intersections along North Raod. 2018 $14,680
Lougheed-Sharpe City Wide Greenway Cycling This project follows the Regional Bikeway Network running north-south and parallel to Lougheed Hwy connecting the Coquitlam Central Station area to Chilko Dr to the south. 2018 $1,155,000
Project Name Project Type Project Description Funding Year(s) TransLink Funding
116 Street and 72 Avenue Intersection Improvement Project Road Intersection improvements at 116 Street and 72 Avenue. 2012 $140,000
River Road Roadway Improvement Project - Huston Road to 80 Street Road Intersection improvements at River Road and Huston Road. 2012 $557,000
North Delta Cycling Network Update Cycling Cycling improvements in North Delta. 2012 $25,000
56 Street Roadway Improvement Project Road Corridor improvements along 56 Street between 1 Avenue and 4 Avenue, including bike lanes. 2013 $275,000
Ladner Trunk Road Improvement Project - Highway 17 to 64 Street Road Widening Ladner Trunk Road between Highway 17 and 64 Street, including bike lanes. 2013 $424,500
116 Street Cycling Improvement Project Cycling Roadway and cycling improvements on 116 Street between 92 Avenue and 96 Avenue. 2013 $78,000
Ladner Trunk Road and 72 Street Intersection Improvement Project Road Bike lane installation and roadway improvements along Ladner Trunk Road between 64 Street and 72 Street. 2014, 2015, 2016 $312,500
Ladner Trunk Road and 88 Street Signalization Project Road New traffic signal at the intersection of Ladner Trunk Road and 88 Street. 2015 $150,000
Nordel Way Signal Coordination Road Traffic signal coordination at six intersections along Nordel Way between 120 Street and 84 Avenue. 2015 $20,000
Tasker Floodbox Replacement Road Dike seismic upgrades, replacement of floodbox and roadway reconstruction. 2017 $120,000
Arthur Drive Roadway and Utility Improvements (Deltaport Way to Augustine House) Cycling Roadway widening, streetlight improvements at 3 intersections, drainage improvements and construction of 1.5 m bike lanes. 2017 $354,060
8A Avenue (English Bluff Road to 56 Street) Roadway and Utility Improvements Pedestrian Roadway widening, crosswalk upgrades, new sidewalks and bus stop improvements. 2017 $171,800
120 Street Traffic Signal Upgrades (8000 Block to 8100 Block) Road Traffic signal improvements along 120 Street between 8000 block and 8100 block to address increasing vehicle and pedestrian volumes along the corridor. 2018 $75,000
Ladner Trunk Road (96 Street - 104 Street) Roadway & Utility Improvements Road Roadway improvements including bus stop upgrades, new bike lanes, utility upgrades and roadway rehabilitation. 2018 $405,084
Nordel Way Safety Improvements Road Safety improvements along Nordel Way to improve driver awareness of the 60km/h posted speed limit (by use of a speed radar message board sign) and extending the physical barrier between northbound and southbound traffic on Nordel Way. 2018 $120,700
8A Avenue (52 Street to 56 Street) Roadway and Utility Improvements Cycling Roadway improvements include new bike lanes, streetlighting, sidewalk improvements, utility upgrades and roadway rehabilitation. 2018 $677,216
86 Avenue (116 Street - 120 Street) Roadway and Utility Improvements Pedestrian Improvements include road widening, new roll over curb and gutter, streetlighting, new sidewalk on both sides of 86 Avenue, utility improvements and roadway rehabilitation in order to improve accessibility and mobility for vehicles and pedestrians. 2018 $127,000
Nordel Way BNSF Overpass Abutment Investigation Structure Engineering study to confirm the causes of ongoing abutment settlement and identify appropriate remediation. 2018 $100,000
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Fraser Highway at Production Way Railway Signal Improvement Project Road Railway traffic signal improvements at the intersection of Fraser Highway and Production Way. 2012 $56,250
48 Avenue Cycling Project - 20400 Block to 210 Street Cycling Cycling improvements on 48 Avenue between 204 Street and 210 Street. 2013 $209,000
203 Street Bike Improvement Project Cycling New multi-use pathway and bike lanes on 203 Street between Grade Crescent and Michaud Crescent. 2016 $171,500
48 Avenue Bike Lanes Cycling Roadway widening and installation of bike lanes over a 640 m segment. 2017 $259,000
Duncan Way Sidwalks Pedestrian Construction of 1.5m sidewalk on south side and 3.0m multi-use path on north side. 2017 $166,000
208 St Bike Lanes Cycling The 208 St bike route currently has a 'gap' between Fraser Hwy and 52 Ave where no bike lanes or off street paths exists. This project would connect this gap by providing off street paths as well as bridges over the Nicomekl River near Fraser Hwy. 2018 $734,000
Glover Road Bike Lane Project Cycling This project will provide 1.5-1.8m wide protected bike lanes for the whole length of the project and connect the Downtown Langley Transit Exchange and future Rapid Transit Station to the Township of Langley, Kwantlen University and City Centre. 2018 $648,000
Production Way Road Improvements Pedestrian This project will involve widening and ditch infill to accomodate sidewalks and streetlighting. 2018 $40,000
Logan Creek Culvert Replacement Structure Replacement of three 1500mm diameter CSP culverts in parallel on Logan Creek under the Langley Bypass and a fourth culvert 40m south that is 1200mm in diameter and serves a tributary to the main creek. 2018 $977,000
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Fraser Highway (Murrayville to Aldergrove Connector) Widening Project Road Widening Fraser Highway from 100 m west of 232 Street to the 23400 block from a 2 lane rural standard to a 4 lane divided arterial standard with bicycle lanes, curb, gutter, sidewalk, street lighting, storm sewer, and landscaping. 2012, 2013, 2014, 2015 $2,580,000
40 Avenue Cycling Improvement Project Cycling Cycling improvements on 40 Avenue between 200 Street and 240 Street. 2012 $44,960
Glover Road Cycling Improvement Project Cycling Cycling improvements on Glover Road between Highway 10 and Mavis Avenue. 2012 $30,640
48 Avenue Cycling Project - 210 Street to 222 Street Cycling Cycling improvements on 48 Avenue between 210 Street and 222 Street. 2013 $80,000
32 Avenue Bike Lanes Cycling New cycling facilities along 32 Avenue and 276 Street. 2014 $32,000
Willowbrook Cycling Improvement Project Cycling Cycling improvements along multiple bike routes in the Willowbrook area, including 203 Street, 202B Street, 66 Avenue, Willoughby Way, 197 Street, 68 Avenue, and 197B Street. 2014 $35,000
McKinnon Crescent Cycling Improvement Project Cycling New bicycle facilities along Allard Crescent and McKinnon Crescent that connect to Fort-to-Fort Trail. 2015 $80,000
Fraser Highway Widening Project Road Widening Fraser Highway between 269 Street and 271 Street, including new bike lanes. 2016, 2017 $1,440,000
Brookswood Connector Bike Improvement Project Cycling New bikeways within the Brookswood and Fernridge communities. 2016 $80,000
16 Avenue Corridor Improvements Road Signal and intersection improvements. 2017, 2018 $1,365,000
North Langley Connector Phase 1 Cycling Construction of mixed cycling facilities on River Road and Glover Road and a shoulder bikeway on 248 Street. 2017 $80,000
Aldergrove Transportation Improvements Pedestrian Construction of sidewalks, a raised crosswalk and improved streetlighting. 2017 $187,000
232 St and 64 Ave Intersection Improvements Road Construction of a roundabout at the intersection of 232 St and 64 Ave to upgrade the intersection control to a higher level by providing a better Level of Service (LOS) and volume to capacity (v/c) ratio with smaller vehicle queues. 2018 $300,000
Fraser Hwy Widening and Intersection Improvements (24600-25000 Blk) Road The widening project will alleviate congestions by adding additional capacity. The intersection improvements at 248 St/Fraser hwy will improve the intersection and corrior safety and improve the signal operation efficiency. 2018 $2,133,250
North Lanley Connector Phase 2 Cycling This project will provide a safer cycling connection between the community Centres of Fort Langley, Murrayville and Aldergrove in Langley. 2018 $552,000
92A Avenue Sidewalk Improvement Project Pedestrian Constructing new sidewalk on the north side of 92A Avenue between 200 Street and 198 Street. New sidewalk will add walking infrastructure to a busy commercial and retail area, and will connect to existing sidewalk on 200 Street. 2018 $71,500
202 Street Sidewalk Improvement Project Pedestrian Constructing new sidewalk on the east side of 202 Street between 62 Avenue and 64 Avenue. New sidewalk will add walking infrastructure to a busy commercial and retail area, and will connect to existing sidewalk on 64 Avenue. 2018 $71,500
16 Avenue - Howes Creek Culvert Rehabilitation Structure Rehabilitation and/or replacement of three (3) deteriorating and failing corrugated metal pipe (CMP) cross culverts across 16th Avenue at the 26600 Block. 2018 $194,032
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Lions Bay Avenue Stairs to Bus Stop Pedestrian The project entails the replacement of a set of stairs that are in serious disrepair. The project includes the removal of the existing stair case, form work and reinforcing steel placement, and pouring of new concrete or use pre-cast concrete stairs. 2018 $40,000
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Abernethy Multi-Use Path Intersection Improvement Project Road Intersection improvements along the Abernethy multi-use pathway at 227 Street, 228 Street, and 230 Street. 2012 $326,000
128 Avenue Widening Project with Multi-Use Path Cycling Advancing a segment of 128 Ave to upgrade the existing 2 lane roadway to a 4 lane roadway from 210 St. to 216 St. 2012, 2013, 2014 $1,282,560
203 Street Cycling Improvement Project Cycling Installation of a fully protected by-directional bike facility on the east side of 203 Street between Dewdney and Powell Ave. 2012 $55,600
128 Avenue Multi-Use Path Cycling New multi-use pathway on 128 Avenue between 216 Street and 224 Street. 2016 $123,100
Fern Crescent - 232 Street to 236 Street Road Road realignment and construction of 4.0 m-wide multi-use path. Intersection improvements at Fern Crescent and 236 Street. 2017 $609,000
232 Street Improvements (132 Ave to Silver Valley Road) Cycling Construction of 4.0 m-wide bi-directional separated bike lanes. 2017 $251,340
River Road Sidewalk west of 223 Street Pedestrian Road widening, construction of new sidewalks and streetlight installation. 2017 $217,000
Abernethy Way (224 St - 232 St) Road Project to upgrade this corridor to a four lane arterial roadway standard with multi-use pathway, street lighting, culvert extensions/upgrades, relocations of existing traffic signal poles, intersection improvements, retaining walls, signage. 2018 $743,000
Lougheed Highway Multi Use Path Road Construction of MUP on the north side of Lougheed Highway between 222 Street and 220 Street will encourage cycling and provide safe cycling access for west Maple Ridge residents to access the town centre. 2018 $150,000
227 Street Bike Lane (Abernethy Way to Dewdney Trunk Road) Cycling Project to improve cycling facilities on 227 Street by providing protected bike lanes on both sides of 227 Street from Abernethy Way to Dewdney Trunk Road. 2018 $550,000
207 Street (Dewdney Trunk Road to 117 Avenue) Pedestrian Improvements on 207 Street between 117 Avenue and Dewdney Trunk Road. Improvements include the north and south legs of the intersection at Lougheed Highway which is a provincially regulated and maintained intersection. 2018 $87,000
Project Name Project Type Project Description Funding Year(s) TransLink Funding
McBride Boulevard at East Columbia Intersection Safety Improvement Project Road Intersection safety improvements at McBride Boulevard and East Columbia Street. 2012 $56,500
East Columbia Street at Richmond Street Intersection Safety Improvement Project Road Intersection safety improvements at East Columbia Street and Richmond Street. 2012 $60,000
Westminster Highway Corridor Signal Progression Implementation Road Implement signal progression on Westminster Highway between Boundary Road and Howes Street. 2012 $50,000
Westminster Highway at Boundary Road Signal Upgrade Project Road New traffic signal at Westminster Highway and Boundary Road. 2012 $45,000
London Street and 20 Street Intersection Cycling Improvement Project Cycling Intersection cycling improvements at London Street and 20 Street. 2012 $42,200
Begbie Street and Front Street Intersection Cycling Improvement Project Cycling Intersection cycling improvements at Begbie Street and Front Street. 2012 $5,000
Quayside to Queensborough Pedestrian and Bicycle Bridge Cycling "Proposed Q2Q pedestrian and bicycle bridge is a 230 m long bicycle route across a natural waterway barrier connecting three regional greenways/bikeways (i.e., BC Parkway, Brunette-Fraser Regional Greenway, Central Valley Greenway)." 2015, 2016 $381,400
Boyd Street Multi-Use Path Cycling Removal of shoulder bike lanes and construction of a 4.0 m-wide multi-use path on the north side. 2017 $30,000
Connaught Heights Walking Infrastructure Improvement Program Pedestrian Construction of 2 metre wide sidewalk. 2017 $221,600
Boyd Street - Street Lighting Program Road Street lighting installation and upgrade program for Boyd Street in Queensborough. The goal is to provide street and pedestrian level lighting so that all modes of transportation can safely traverse the corridor. 2018 $164,000
Royal Avenue at 11th Street Pedestrian Crossing Road Installation of a pedestrian controlled signal traffic signal with advanced warning beacons. 2018 $224,000
Brunette Fraser Greenway - Braid Street Section Phase II Cycling Phase one of the project is the construction of a pathway for cyclists and pedestrians between Canfor Avenue and the rail tracks adjacent to Brunette Avenue. Phase two is the crossing of the rail tracks and work is planned for completion in 2018. 2018 $787,500
Phillips Street Sidewalk Pedestrian The purpose of this project is to provide sidewalk, boulevard and street lighting on Philips Street between Canil Avenue and Ewen Avenue. 2018 $82,000
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Esplanade Bike Lane Installation and Streetscape Improvement Project Cycling Project to provide cycling lane on the south side of Esplanade between Lonsdale and Chesterfield. 2012 $132,500
Lonsdale Avenue Pedestrian Safety Improvement Project Road Installation of additional signal heads at 3rd Street at Lonsdale not installed. 2012 $132,000
Chesterfield Avenue Cycling Improvement Project Cycling Cycling improvements on Chesterfield Avenue between 4 Street and 13 Street. 2012 $36,000
Lynn Valley Road / Boulevard Crescent Cycling Improvement Project - E 19 Street to William Avenue Cycling Cycling improvements on Boulevard Crescent between E 19 Street and William Avenue. 2012 $158,000
East 13 Street Bike Route - St. Georges Avenue to West Grand Boulevard Cycling East 13 Street Bike Route improvements between St. Georges Avenue and West Grand Boulevard. 2013 $13,000
Spirit Trail - Carrie Cates Court Section Cycling New shared-use off-street bicycle facility as part of the Spirit Trail along Carrie Cates Court. 2013 $176,800
St. Andrews Avenue Bike Improvement Project Cycling Cycling improvements along the St. Andrews Bike Route between Esplanade Avenue and 23 Street. 2014 $13,000
Jones Avenue Bike Route Cycling A multi-use path installed adjacent to Jones between Keith and 21st. 2014 $15,000
Third Street Pedestrian and Cycling Improvement Project Cycling Cycling improvements along Third Street between Forbes Avenue and 2nd Street. 2014 $340,000
Lonsdale Avenue Pedestrian Safety Improvement Project Road Intersection safety improvements along Londale Avenue between 4 Street and 6 Street. 2012 $111,000
Green Necklace Greenway - East Keith Road and Grand Boulevard Cycling New cycling facilities on East Keith Road and Grand Boulevard. 2016 $382,700
West Keith Bicycle and Multi-use Facilities Cycling Combination of on-street, off-street and shared-use bike lanes, inluding the construction of a 3.0 m-wide multi-use path. 2017 $660,900
Chesterfield Bike Route - South of Esplanade Cycling Construction of separated bike facilities. 2017 $16,000
Traffic Signal - E. 3rd St. and St. Andrew's Ave. Cycling Installation of new traffic signal. 2017 $35,000
Green Necklace Multi-use Greenway on 21st Street Cycling Construction of 3.0 m-wide multi-use path. 2017 $262,270
Mackay Road Multi-Use Path Cycling Construction of 4.0 m-wide multi-use pathway on the west side of the road. 2017 $53,000
Green Necklace - Lonsdale Avenue to Grand Boulevard Cycling This section, from Lonsdale Avenue to Grand Boulevard, will complete an off-road cycling loop around the Central Lonsdale area, offering connections to the recreational facilities on 23rd Street and supporting elementary and secondary students. 2018 $1,213,000
Traffic Signal at 4th Street and Lonsdale Avenue Pedestrian Design and construction of a new traffic signal for the intersection at Lonsdale Ave and 4th Street in North Vancouver. 2018 $215,000
Marine Drive Bridge Replacement at Mosquito Creek Structure Redesign and replacement of the existing concrete bridge. 2018 $1,651,667
Marine Dr Bridge Replacement at Mackay Creek - Preliminary and Detailed Design Structure Redesign of the existing concrete culvert, which functions as a bridge, with intention to replace it within 3 to 5 years, as recommended in 2017. 2018 $180,000
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Mount Seymour Parkway Bridge - Seismic Retrofit Project Road Re-casting of concrete link slabs and pier cap surface preparation and shear strengthening utilizing fibre reinforced polymer (FRP) wraps. 2012 $161,091
Dollarton Highway Cycling Improvement Project Cycling Implementation of shared lane markings and signs on Dollarton Highway (Raven Woods Drive). 2012 $26,082
Capilano Road / Nancy Greene Way Cycling Improvement Project Cycling Cycling improvements on Capilano Road / Nancy Greene Way between Highway 1 and Grouse Mountain. 2012 $40,518
Mount Seymour Parkway at Broadview Drive Pedestrian Signal Upgrade Road Signal upgrade at the intersection of Mount Seymour Parkway and Broadview Drive. 2013 $75,000
Lynn Valley Road / Boulevard Crescent Cycling Improvement Project - William Avenue to Highway 1 Cycling New bike lanes on Lynn Valley Road between Highway 1 and William Avenue. 2013, 2015 $161,000
Mount Seymour Parkway Bike Lanes Road New bicycle lanes on Mount Seymour Parkway between Seymour Boulevard and Riverside Drive. 2013 $298,038
Lynn Valley Road / Boulevard Crescent Cycling Improvement Project - William Avenue to Mollie Nye Way Cycling New bike lanes on Lynn Valley Road between William Avenue and Mollie Nye Way. 2016 $149,200
Mountain Highway Pedestrian Improvements Pedestrian Construction of sidewalk and designated pedestrian crossing. 2017 $120,000
Spirit Trail (Central) CNV Border – E. Keith Road Cycling The District of North Vancouver’s portion of the Spirit Trail aims to fill the gap and continue the trail being established by neighbouring North Shore Municipalities across the central and eastern portions of the North Shore, to serve people of all ages. 2018 $2,498,000
William Avenue Sidewalk Pedestrian This project connects people north of E 29th Street to Lynn Valley Town Centre on the south, which include transit stops as well as Boundary Elementary school, and Karen Magnussen Community Recreation Centre. 2018 $96,000
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Neaves Road and Rannie Road Bike Lanes Cycling Construction of shoulder bike lanes. 2017 $180,060
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Coast Meridian Road and Patricia Avenue - Pedestrian and Bike Signal Upgrade Cycling Intersection cycling improvements at Coast Meridian Road and Patricia Avenue. 2012 $42,500
Shaughnessy Street and Fraser Avenue Signal Upgrade with Bike Activation Cycling Installation of a new signal with bicycle activation at the intersection of Shaughnessy Street and Fraser Avenue. 2013 $50,000
Lougheed Highway Road Widening Cycling Road widening and construction of a bike lane on the north side. 2017 $37,000
Pitt River Road & McLean Avenue Road Rehabilitation Cycling Road reconstruction and installation of sidewalks and 1.5 m bike lanes. 2017 $299,500
Donald Street Pathway Cycling The Donald Street Pathway is a key pedestrian and cyclist link in Port Coquitlam's city centre providing a continuous, safe and pleasant connection between Central Elementary School, Elks Park and downtown. 2018 $920,000
Patricia, Hastings and Shaughnessy Multi-Use Paths Cycling This project includes the construction of three multi-use paths which connect Port Coquitlam to the Evergreen line: Patricia Avenue Multi-Use Path (MUP), Hastings Street MUP and Shaughnessy Street MUP. 2018 $198,000
Coquitlam River Bridge Replacement - Preliminary Design Structure This project will provide engineering assessements and a preliminary design of selected option(s) from a 2017 Preliminary Planning Study that can be used to prepare a cost estimate and request external funding for detailed design and construction. 2018 $75,000
Coquitlam River Bridge Replacement - Design and Construction Structure This project will allow for design and construction of the Coqutilam River bridge. 2018 $5,000,000
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Ioco Road at Barber Street - Pedestrian Safety Improvement Project Road Crosswalk safety improvements - Addition of curb extension to improve pedestrian visibility, sightlines, and reduce crossing distance and construction of centre median. 2012 $34,250
Barnet Highway Overpass - Westbound Deck Replacement Project Road Barnet Highway overpass bridge deck replacement between Dewdney Trunk Road and Ioco Road. 2012, 2017 $701,425
Ungless Way Cycling Project Cycling Cycling improvements along Ungless Way between Ioco Road and Guildford Way. 2012 $22,200
Moody Street Overpass - Seismic Upgrade Road Seismic upgrade of the Moody Street overpass. 2013 $332,640
Ioco Road at Campbell Road Crosswalk Installation Road Pedestrian improvements at the intersection of Ioco Road and Campbell Road. 2013 $71,925
Moody Street Overpass - Cycling Improvement Project Road Pedestrian and cycling improvements on the Moody Street overpass. 2013 $13,026
Moody Street Overpass - Cycling Improvement Project Road Pedestrian and cycling improvements on the Moody Street overpass. 2013 $313,286
Murray Street Bike Extension Project - Phase 1 Cycling Construction of an off-street bike lane on Murray Street. Construction of two signalized intersections. 2014, 2018 $970,000
Ioco Road Crosswalk Improvements Road Installation of Rectangle Rapid Flashing Beacons (RRFB) at five (5) crosswalks on the Ioco Road Corridor and adding Accessible Pedestrian Siginals (APS) at five (5) locations. 2018 $47,000
Newport Crosswalk Improvements Pedestrian Installation of concrete curb extensions, drainage and accessibility improvements at two crosswalk locations on Newport Drive. 2018 $40,000
Improved Pedestrian Access to Moody Centre Skytrain and Westcoast Express Station Pedestrian Design and construction of a new accessible pedestrian ramp and staircase connecting west side Moody Centre Rapid Transit Station to Moody Street, Moody Street Overpass and Clarke Street. 2018 $131,250
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Westminster Highway Pedestrian and Cycling Improvement Project Cycling Pedestrian and cycling improvements along Westminster Highway between Gilley Road and Fraserside Gate. 2012 $90,000
Richmond Vehicle Detection System Upgrade Road Intersection Improvement including installation of vehicle detection system : Minoru Blvd-Westminster Hwy, No, 3 Road-Westminster Hwy, No. 2 Road-Blundell Centre and No. 2 Road -Williams Road. 2012 $100,500
Gilbert Road Widening and Improvement Project Road Widening Gilbert Road between Lansdowne Road and River Road, including bike lanes. 2012 $924,750
Parkside Neighbourhood Bike Route Cycling Cycling improvements along Ash Street between Granville Avenue and Williams Road. 2012 $133,500
Railway Avenue Greenway - Westminster Highway to Garry Street Cycling Design and construction of a 3.7 km off-street paved 2-way multi-use pathway within the former CP Rail right-of-way parallel to Railway Avenue The project scope was extended to include the section between Granville Ave and Westminster Hwy. 2012, 2013 $472,899
Crosstown Bike Route Improvement Project (Phase 1) Cycling Road improvements on the Crosstown Bike Route along Colville Road. 2014 $105,000
Bike Lane Safety Improvement Project - Garden City Road and Granville Avenue Cycling Application of green-coloured anti-skid treatment in northbound and southbound bike lanes to demarcate the conflict zones (i.e., where right-turning vehicles must cross the through bike lane). 2014 $17,000
Parkside Bike Route - Pedestrian and Bike Signal Upgrade Cycling Pedestrian and bike signal upgrades on the Parkside Bike Route at Blundell road and Ash Street. 2014 $60,000
Steveston Highway Vehicle Detection System Upgrade Road Installation of vehicle detection camera systems at six intersections along Steveston Highway between Gilbert Road and Coppersmith Place. 2014 $111,000
Railway Avenue Greenway - Crosswalk Upgrade Project Cycling Crosswalk improvements on the Railway Avenue Greenway at the intersections of Westminster Highway at McCallan Road and Granville Avenue at McCallan Road. 2014 $91,000
Crosstown Bike Route Improvement Project (Phase 2) Cycling Cycling improvements along the Crosstown Bike Route connecting Danube Road and Lucas Road. 2015 $210,000
River Drive Multi-Use Path Cycling New multi-use pathway on River Drive between Van Horne Way and No. 4 Road. 2016, 2017 $378,500
No. 2 Road Multi-Use Path Cycling Intersection improvements, road widening and construction of off-street paved 3.0 m multi-use path. 2017 $620,000
No. 2 Road Walkway Cycling Construction of a 1.5 m-wide sidewalk. 2017 $200,000
Sexsmith Road Multi-Use Path Cycling Construction of a 6.1 m-wide multi-use pathway and 4.0 m-wide sidewalk with intersection improvements. 2017 $248,000
Great Canadian Multi-Use Path Cycling Construction of a 3.0 m-wide off-street multi-use path and installation of pedestrian lighting. 2017 $150,000
Westminster Highway Multi-Use Path Cycling Construction of off-street 3.0 m-wide multi-use path. 2017 $200,000
Odlin Road Bike Route Cycling Upgrade of existing and construction of new off-street multi-use pathways combined with signage and pavement markings on local streets (primarily Odlin Road) to establish a new east-west bike route that connects to and within Richmond's Urban Centre. 2018 $140,000
Off-Gilbert Bike Route - Phase 1 Cycling Phase 1 of new north-south local street bikeway parallel to and east of Gilbert Road between Steveston Highway and Granville Avenue. 2018 $75,000
River Parkway - Protected Bike Lanes Cycling Provision of on-street protected directional bike lanes and off-street pedestrian facility as part of the construction of a new major street within Richmond's Urban Centre along the former CP Rail corridor between Gilbert Road and Cambie Road. 2018 $2,266,000
Westminster Highway MUP Upgrade Road Upgrade of off-street multi-use pathway on Westminster Highway between No. 6 Road and No. 7 Road. 2018 $360,000
Crosstown Neighbourhood Bike Route - Phase 3 Cycling Intersection upgrades (curb bulges, sidewalk widening, ramps) to facilitate the east-west movement of cyclists along two off-set local streets that cross an arterial roadway. 2018 $80,000
Parkside Neighbourhood Bike Route - Northern Extension Cycling Northern extension of Parkside Neighbourhood Bikeway through Garden City Park and Anderson Elementary School to Alder Street, a local street, and terminating at Westminster Highway, which is an existing east-west bike route. 2018 $50,000
Riverside Industrial Park - Pedestrian Connections to Transit Pedestrian Completion of gaps in the existing pedestrian network within Riverside Industrial Park via the provision of asphalt pathways and concrete sidewalks connecting to bus stops where needed plus the addition of two transit shelters. 2018 $272,000
Cambie Road Multi-Use Pathway Pedestrian Completion of gaps in the existing pedestrian network within Riverside Industrial Park via the provision of asphalt pathways and concrete sidewalks connecting to bus stops where needed plus the addition of two transit shelters. 2018 $288,750
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Fraser Highway Widening Project - 168 Street to 17300 Block Road Widening Fraser Highway between 168 Street and 17300 Block, including bike lanes and multi-use pathway. 2012 $1,895,783
King George Boulevard Widening Project - 34 Avenue to 32 Avenue Road Widening King George Boulevard between 34 Avenue and 32 Avenue Diversion, including bike lane and sidewalk. 2012, 2015 $5,194,717
Barnston Drive Greenway Cycling New multi-use pathway and bike lanes along Barnston Drive W between 168 Street and 170A Street. 2012, 2013 $591,305
Surrey Lake Greenway - Coopershawk Creek to 144 Street Cycling New multi-use pathway along the hydro corridor south of 84 Avenue between 140 Street and Coopershawk Court. 2012 $185,700
16 Avenue and Hwy 99 Interchange Improvement Project Cycling 16 Avenue and Highway 99 interchange improvements, including bike lanes. 2013, 2014 $4,655,895
Surrey Lake Greenway - Coopershawk Court to 144 Street Cycling New Surrey Lake Greenway multi-use pathway between Coopershawk Court and 144 Street. 2013 $150,585
Tannery Greenway Cycling New multi-use pathway on Scott Road between Tannery Road and Old Yale Road. 2014 $399,000
102 Avenue Cycling Improvement Project Cycling Bicycle improvements on 102 Avenue between 140 Street and University Boulevard. 2015, 2017 $900,300
King George Boulevard Widening Project - 32 Avenue to 152 Street Road Widening King George Boulevard between 32 Avenue Diversion and 152 Street, including new bike lanes. 2016 $2,064,000
Fraser Heights Greenway Cycling New multi-use pathway and neighbourhood bikeways along the Fraser Heights Greenway corridor. 2016 $752,900
64 Avenue Arterial Improvements and Widening, 184 St to Fraser Hwy Road Widening to four lanes and construction of raised medians, sidewalks and bike lanes. 2017 $5,040,000
64 Avenue Arterial Improvements and Widening, Fraser Hwy to 196 St Road Widening to 4 lanes and construction of landscaped medians, sidewalk and multi-use pathway. 2017 $2,279,000
100 Avenue Separated Bike Lanes Cycling Widening to four lanes and construction of a 2.0 m-wide raised bike lane. 2017 $498,200
81 Avenue Sidewalk and Connections Pedestrian Construction of sidewalks on 81 Avenue, 134A Street and 135 Street. 2017 $230,600
Fraser Highway Widening & Improvements Whalley Blvd to 140 Street Cycling The Fraser Highway Widening & Improvements project is to widen Fraser Highway from the existing 2 lane road, to 4 lanes and provide new and improved cycling facilities through raised and separated bike lanes. 2018 $4,965,000
105 Avenue Protected Bike Lanes - Whalley Blvd to 140 Street Cycling The entire project extends from Whalley Blvd to 150 Street and will connect Surrey City Centre with Guildford Town Centre. 2018 $844,000
Green Timbers Greenway - 134 Street to 138 Street Cycling This project is the construction of approximately 900m of off-street Multi-Use Pathway (MUP) and short bridge structure that will complete the last remaining portion of the Green Timbers Greenway. 2018 $790,000
100 Avenue Protected Bike Lanes - King George Blvd to 140 Street Cycling This project is the construction of approximately 700m of road widening from 2 lanes to 4 lanes along with multi-modal improvement on 100 Avenue from King George Boulevard to 140 Street. 2018 $600,000
144 Street Multi-Use Path Pedestrian 144 Street Multi-use path provides a major connection to transit facilities at 104 Ave and 144 St and is part of Bon Accord Greenway. On the south side this Mup will connect to 100 Avenue and RCMP Division E as well as Lena Shaw Elementary School. 2018 $465,000
Connections From 105A Avenue to 104 Ave around 140 ST LRT station Pedestrian This project will provide the necessary walking infrastructure from the future 105A Avenue to the LRT station at 104 Ave and 140 St. 2018 $600,000
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Tsawwassen Drive to Breakwater Multi-Use Boardwalk Path Cycling New multi-use pathway on Tsawwassen Drive between Blue Heron Drive and Breakwater Path. 2015 $188,900
Bike Lane as part of the upgrade and improvements of 27B Ave Cycling Bike Lane as part of the upgrade and improvements of 27B Ave. 2018 $70,000
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Fraser River Parkade Secure Bike Parking Facility Cycling Secure bike parking facility at Fraser River Parkade. 2012 $8,700
SW Marine Drive Northbound Bike Lane Widening Project Cycling Widening SW Marine Drive between 41 Avenue and Wesbrook Mall to accommodate a separated bike lane and parking lane. 2012 $75,000
UBC Secure Bike Parking Facilities Cycling Secure bike parking facility at UBC. 2013 $127,500
Wesbrook Mall Redesign - Phase 1 Cycling This project aims at creating a complete street that retains its people moving functionality, but for all users not just vehicles - to accommodate cyclists and pedestrians in an allocated or separated facility. 2018 $285,000
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Kingsway Norquay Corridor Improvement Project Road Roadway improvements along Kingsway between Gladstone Street and Dundee Street, including cycling improvements. 2012 $947,500
Boundary Road at Grandview Highway Intersection Improvement Project Road Intersection improvements at Boundary Road and Grandview Highway. 2012 $940,000
Granville Bridge Bearing Replacement Project Road Concrete repairs and repair of 2 concrete diaphragms. 2012 $2,018,500
Dumfries Bikeway Improvement Project Cycling Ped/Bike signal construction at Fleming and 57th which is part of the construction of the bikeway along the Fleming Street alignment. 2012 $200,000
45th Avenue Bikeway Improvement Project Cycling Intersection safety improvements along the 45 Avenue Bikeway on 45 Avenue, Inverness Street, 47 Avenue, and Nanaimo Street. 2012 $266,000
Comox - Helmcken Greenway Section 1 Improvement Project Cycling Construction of the Comox - Helmcken Greenway (Class 1 Facility - Comfortable for all cyclists) to connect Stanley Park to False Creek. 2012, 2013 $1,230,947
Burrard Street Bridge South End Improvement Project Road Cycling improvements at the intersection of Burrard Street and Cornwall Avenue. 2014 $800,000
York Avenue Bikeway Cycling New separated bike lanes on York Avenue between Seaforth Park and Maple Street, including a new signal at Stephens Street and Point Grey Road. 2014 $209,000
Burrard Bridge North End Improvement Project Road Cycling improvements at the intersection of Burrard Street and Pacific Street. 2015, 2016 $4,817,300
SW Marine Drive Bike Lane Widening Project Cycling Improved bike lanes along Marine Drive between Granville Street and Dunbar Street. 2016, 2017 $2,825,000
South False Creek Seawall - Creekside Drive Bike Lanes Cycling New separated bike lanes on Creekside Drive between W 1st Avenue and Burrard Bridge. 2016 $123,100
10th Avenue Cycling Corridor Project Cycling Cycle tracks on 10th Ave between Oak and Willow Street. 2017 $1,500,000
Knight Street & SE Marine Drive Interchange Improvements Road Intersection improvements and cycling and pedestrian access improvements at Knight Street & SE Marine Drive interchange. 2017 $1,500,000
Union and Adanac Cycling Corridor Improvements Cycling Cycling improvements on Adanac and Union Streets between Gore Avenue and Kamloops Street. 2017 $245,870
Joyce-Collingwood SkyTrain Station Walking Infrastructure Improvements Pedestrian Construction of sidewalks on McHardy, Payne, and Ruby Streets in vicinity of Joyce-Collingwood SkyTrain Station. 2017, 2018 $378,400
10th Avenue Corridor Project Cycling The central goal of the project is to improve the route for people of all ages-and-abilities (AAA) to walk or cycle. 2018 $1,725,000
10th Avenue Health Precinct Street Improvements Cycling 10th Ave between Oak and Cambie Streets serves as a critical access point for Vancouver General Hospital, emergency, and other health institutions. 2018 $1,500,000
Quebec St and E 1st Ave Cycling The Quebec St and E 1st Ave project upgrades existing painted bike lanes on E 1st Ave (part of the CVG) to protected bike lanes. 2018 $1,354,000
Public Bike Share Phase II Expansion Cycling The Public Bike Share Phase II Expansion is expected to include approximately 50 stations, 500 bicycles, and the associated implementation. 2018 $1,000,000
Alexander and Powell Street Bikeway Cycling The City of Vancouver is addressing a major gap in the bike network by making Alexander Street and Powell Street safer and more comfortable for people of all ages and abilities to cycle. 2018 $600,000
Champlain Heights Pedestrian Improvements Pedestrian This project will improve pedestrian access to transit options in the Champlain Heights neighbourhood through the construction of 600 metres of sidewalks to fill in gaps in the existing sidewalk network. 2018 $150,000
2018 WITT Curb Ramps Pedestrian Installation of curb ramps in approximately 150 locations (to be prioritized) to improve pedestrian access to transit options within the City of Vancouver. 2018 $418,000
Norquay Village Pedestrian Improvements Pedestrian This project will improve pedestrian access to transit, parks, and schools in the Norquay Village neighbourhood through the construction of new sidewalks to complete the existing network. 2018 $125,000
Granville Bridge - Rehabilitation North Concrete Approach Structure Rehabilitation of the north concrete approaches (concrete repairs, bearing repairs/replacement) of the Granville street bridge. 2018 $1,886,792
Granville Bridge - Rehabilitation South Approach, Howe and Seymour Ramps Structure Rehabilitation of the concrete south approach, and the Howe and Seymour ramps (concrete repairs, expansion joint replacement, bearing repairs/replacement) of the Granville street bridge. 2018 $3,398,009
Cambie Bridge - Seismic Upgrade and Rehab Design Structure Design of seismic upgrades (foundation, pers, exp joints) and rehabilitation (deck, concrete, bearings, pole base connections and lighting) of the Cambie bridge. 2018 $1,037,500
Granville Bridge - Steel Span - Seismic Upgrade and Rehabilitation Structure Rehabilitation (expansion joints - finger joints, concrete and steel repairs, localized painting) and seismic base isolation of the steel spans of the Granville street bridge. 2018 $5,000,000
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Marine Drive Road Widening Project Road Widening Marine Drive between Taylor Way and 11 Street to include cycling facilities. 2012 $159,000
Spirit Trail Connector to the Lions Gate Bridge Cycling Project to provide cycling connection between westbound bike lane over the Capilano Bridge and Spirit Trail. 2012 $82,500
Spirit Trail - Marine Drive to Gleneagles Elementary School Multi-Use Path Cycling Spirit Trail construction between Marine Drive / Orchill Road and Gleneagles Elementary School. 2014 $125,000
Spirit Trail - Gleneagles Elementary School - Chatham Street Multi-Use Path Cycling Spirit Trail construction between Gleneagles Elementary School and Chatham Street. 2015 $100,000
Spirit Trail - Royal Avenue Separated Bike Lanes Cycling Spirit Trail construction on Royal Avenue between Chatham Street and Bruce Street. 2016 $100,000
Capilano Pacific Trail Improvements Cycling Construction of 4.0 m-wide multi-use path and improved lighting. 2017 $19,000
Spirit Trail Multi-Use Pathway Cycling Construction of a 3.0 m-wide multi-use pathway. 2017 $25,000
600 Block Inglewood Avenue Sidewalk Pedestrian Construction of 1.8m-wide sidewalk. 2017 $25,000
5900 Block Marine Drive Bike Lanes Cycling The project will involve widening the travel lanes to 3.3 metres to accommodate transit buses. In addition, 1.5m bike lanes would be installed in both directions. 2018 $375,000
Spirit Trail at Wardance Bridge Cycling Construction to to complete the Wardance Bridge portion of Spirit Trail in West Vancouver. 2018 $150,000
Marine Drive Separated Bike Lanes - 26th to 31st Cycling This project will add a 1.35 km separated cycling facility on Marine Drive between 26th and 31st Streets on the existing roadway, using concrete curb stops and delineators to create a safe link between the neighbourhoods of Dundarave and Altamont. 2018 $112,500
Taylor Way at Clyde Avenue Pedestrian Project to reconfigure the south side of the street to create a proper landing area for those walking, add a raised crosswalk to slow traffic and increase visibility of pedestrians. 2018 $52,000
Project Name Project Type Project Description Funding Year(s) TransLink Funding
Marine Drive Cycling Improvement Project Cycling New cycling facilities on Marine Drive between Bishop Road and High Street. 2014 $39,000
Johnston Road Gateway Project Pedestrian This project will involve the reconstruction of Johnston Road’s streetscape from North Bluff Road to Russell Avenue, including new curb bulges to createsafe and convenient crosswalks. 2018 $40,000