 | Location |
Mode
|
Severity
|
Effective
|  |
|---|
| Metrotown Station:
Elevator out of Service | SkyTrain | Minor | Feb 6 2012 12:00:AM |
Effective Monday February 6th, 2012 from 9:00am to 3:00pm. Elevator out of Service
Due to scheduled maintenance the elevator from street level to the platform level will be out of service. Passengers wishing to board SkyTrain at Metrotown station, please obtain assistance from a Skytrain Attendant. Passengers traveling westbound are to continue to Patterson Station and pick up the red emergency phone for assistance. |
| Main Street Station:
SkyTrain Track Maintenance Sun. Feb 5 start of service to 4:00pm | SkyTrain | Major | Feb 5 2012 12:00:AM |
SkyTrain Track Maintenance - Sunday, February 5th from start of service to 4:00pm
Track maintenance affecting Stations between Main and Broadway will be performed. Expect delays. Passengers are asked to please allow an additional 15 minutes to your trip time.
Millennium trains to/from VCC Clark will terminate at Columbia and passengers will be asked to change trains there, using the same platform.
|
| Surrey Central Station:
Elevator Out Of Service | SkyTrain | Major | Feb 3 2012 7:35:AM |
Effective Wednesday February 1st to Tuesday July 31st, 2012.
In preparation for the electronic fare card and faregates the Surrey Central elevator will be closed. We regret the inconvenience however the work is necessary to complete the construction needed to install the new faregates.
During construction, we ask passengers with mobility impairments who require the use of an elevator to use Gateway or King George as their alternate station.
There are four different bus routes connecting Surrey Central and Gateway stations, providing up to 20 trips per hour throughout most of the day. These routes are:
-
C71 Surrey Central Station/Scott Road Station
-
C73 Guildford/Surrey Central Station
-
332 Guildford/Surrey Central Station
-
335 Fleetwood/Surrey Central Station
People who use the elevator now will need to allow extra time for their trips.
Extra staff will be on hand to provide assistance. |
| Scott Road Station:
Elevator/Escalator out of Service | SkyTrain | Major | Feb 3 2012 7:34:AM |
Effective February 1st until October 2012 - Elevator Unavailable due to Faregate Construction
The Scott Road Station elevator (west side) will be out of service due to station renovations for the TransLink Compass Card and Fare Gate project.
Passengers with mobility impairments arriving by bus and requiring an elevator to access the SkyTrain platform may ask an onsite SkyTrain Construction Guide for assistance which will usually be a taxi ride to the elevator on the station’s east side.
Passengers with mobility impairments arriving by bus and requiring an elevator to access the SkyTrain platform may also board the C71 community shuttle. The C71 connects Scott Road, Gateway and Surrey Central stations with hourly service seven days a week and every half hour Monday to Friday during the morning and afternoon rush.
Passengers with mobility impairments arriving by SkyTrain and requiring an elevator to access the bus loop should use the elevator on the east side of the station and then ask an onsite SkyTrain Construction Guide for assistance.
Effective Tuesday February 1st until Friday February 10th, 2012 at 5:30pm - Escalator Repairs.
Due to repairs the up escalator from the east side ticket vending machine level to the platform level will be out of service. |
| Gilmore Station:
Station Alerts | SkyTrain | Minor | Feb 3 2012 12:00:AM |
Effective Friday February 3rd to May, 2012.
Construction will start at Gilmour Station in preparation for faregate equipment installation in May 2012.
Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance. |
| New Westminster Station:
Station Alerts | SkyTrain | Minor | Feb 3 2012 12:00:AM |
Effective Friday February 3rd from 8:00 am to 3:00 pm.
The outbound (to VCC/Clark & King George) stairs and escalator at New Westminster station will be closed due to metal work. Service Impact: Passengers may use the outbound emergency exit stairs or elevator during this time. SkyTrain staff will be on site to direct passengers.
Effective January 8 to February 2012 - In preparation for the new future connections between the outbound (to VCC/Clark & King George) platform and the Plaza 88 development, Plaza 88 will be installing protective hoarding on the outbound platform that will remain until the work for the two connection points is completed in February.
Passengers will be able to access trains from the outbound platform; however, the platform will be narrower than normal.
Effective Monday, December 12th until further notice.
The 'up' escalator from 8th Street to the concourse level will be out of service from
Effective May 25th, 2011 until further notice. Due to construction the existing westbound (to Waterfront) TVM will be removed from service. Tickets may still be purchased at the base of the eastbound (to King George/VCC Clark) elevator or on the TVM level.
Effective Monday June 6th, 2011 until February 2012. - The elevator from McNeely Street entrance to the westbound platform level will be out of service due to construction.
Passengers wishing to travel westbound from New Westminster, please take an eastbound train to Columbia and at Columbia Station, and change over to a westbound train.
Passengers wishing to disembark at New Westminster from a westbound train, please continue to 22nd St. Station and change over to an eastbound train. |
| 29th Avenue Station:
Station Alerts | SkyTrain | Minor | Jan 30 2012 3:27:PM |
Effective Tuesday December 6th, 2011 until further notice.
Due to construction, the south entrance is temporarily closed.
Effective Monday November 14th, 2011 until further notice.
Hoarding and modular fencing will go up at 29th Avenue station for the start of faregate construction.
Passengers will need to walk around the hoarding to access the existing station entrance. |
| Broadway City Hall Station:
Station Alerts | SkyTrain | Minor | Jan 30 2012 12:00:AM |
Effective Monday January 30th to May, 2012.
Construction will start at Broadway-City Hall Station in preparation for faregate equipment installation in May 2012.
Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance. |
| Olympic Village Station:
Station Alerts | SkyTrain | Minor | Jan 30 2012 12:00:AM |
Effective Monday January 30th to May, 2012.
Construction will start at Olympic Village Station in preparation for faregate equipment installation in May 2012.
Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance. |
| Renfrew Station:
Station Alert | SkyTrain | Minor | Jan 30 2012 12:00:AM |
Effective Monday January 30th to May, 2012.
Construction will start at Renfrew Station in preparation for faregate equipment installation in May 2012.
Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance. |
| Yaletown -Roundhouse Station:
Station Alerts | SkyTrain | Minor | Jan 30 2012 12:00:AM |
Effective Monday January 30th to May, 2012.
Construction will start at Yaletown-Roundhouse Station in preparation for faregate equipment installation in May 2012.
Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance. |
| Joyce-Collingwood Station:
Station Alerts | SkyTrain | Minor | Jan 24 2012 12:00:AM |
Effective Monday October 17th, 2011 until further notice.
The north-side entrance into the west-side of the station and the adjacent sidewalk will be closed.
Effective Friday September 16th, 2011 until further notice.
Due to accomodate Faregate construction the Kiss & Ride is closed. Passengers may no longer use this area as a drop-off/pick-up location. All parking stalls in this area will also be closed. |
| Rupert Station:
Station Alert | SkyTrain | Minor | Jan 23 2012 12:00:AM |
Effective Monday January 16th to May, 2012.
Construction will start at Rupert Station in preparation for faregate equipment installation in May 2012.
Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance. |
| VCC-Clark Station:
Station Alert | SkyTrain | Minor | Jan 23 2012 12:00:AM |
Effective Monday January 16th to May, 2012.
Construction will start at VCC-Clark Station in preparation for faregate equipment installation in May 2012.
Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance. |
| Main Street Station:
Station Alerts | SkyTrain | Minor | Jan 19 2012 9:00:AM |
Effective Monday October 17th, 2011 until further notice.
Hoarding and modular fencing will go up at Main Street Station for the start of faregate construction.
Passengers will need to walk around the hoarding to access the existing station entrance.
|
| Stadium Station:
Station Alerts | SkyTrain | Minor | Jan 18 2012 9:00:AM |
Effective Tuesday October 11th 2011, until further notice.
Due to construction, the existing Expo Boulevard (Event) entrance at Stadium station will be closed and a new temporary entrance will be opened in its place.
Passengers may access the new temporary entrance on Expo Boulevard. |
| Burrard Station:
Elevator out of Service | SkyTrain | Major | Jan 17 2012 12:00:AM |
Effective January 17th to February 9th - Escalator Repairs
Due to repairs one the up escalator from westbound platform to ticket vending machines will be out service for repairs from Tuesday Jan 17, 2011 to February 9th at 5:00 pm.
Effective Monday September 26th, 2011 to March 15th, 2012 - Elevator Unavailable due to Faregate Construction
Due to construction of the new faregate entrance hall at Burrard Station, the elevator will be out of service and the station listed as “non-accessible” for approximately four months.
Customers who would normally need to use that elevator will need to go to Granville, Vancouver City Centre or Waterfront Station instead. On weekdays, the #44 connects Burrard Station with Waterfront from 6:37am (from Waterfront) until approximately 8:25pm (to Waterfront).
We apologize for any inconvenience this may cause and appreciate our customers’ patience during this construction period. |
| King Edward Station:
Station Alert | SkyTrain | Minor | Jan 16 2012 12:00:AM |
Effective Monday January 16th to May, 2012.
Construction will start at King Edward Station in preparation for faregate equipment installation in May 2012.
Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance. |
| Langara -49th Ave Station:
Station Alert | SkyTrain | Minor | Jan 16 2012 12:00:AM |
Effective Monday January 16th to May, 2012.
Construction will start at Langara-49th Avenue Station in preparation for faregate equipment installation in May 2012.
Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance. |
| Lougheed Town Centre Station:
Station Alerts | SkyTrain | Minor | Jan 16 2012 12:00:AM |
Effective Monday January 16th to May, 2012.
Construction will start at Lougheed Station in preparation for faregate equipment installation in May 2012.
Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance. |
| Marine Drive Station:
Station Alert | SkyTrain | Minor | Jan 16 2012 12:00:AM |
Effective Monday January 16th to May, 2012.
Construction will start at Marine Drive Station in preparation for faregate equipment installation in May 2012.
Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance. |
| Oakridge -41st Ave Station:
Station Alerts | SkyTrain | Minor | Jan 16 2012 12:00:AM |
Effective Monday January 16th to May, 2012.
Construction will start at Oakridge-41st Avenue Station in preparation for faregate equipment installation in May 2012.
Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance. |
| Bridgeport Station:
Faregate Construction | SkyTrain | Minor | Jan 3 2012 12:00:AM |
Effective January 3 to May 2012
Construction has begun at Bridgeport Canada Line station in preparation for faregate equipment installation in May 2012.
Passengers may need to walk around the construction site to access the existing station entrance.
|
| Waterfront Station:
Station Alerts | SkyTrain | Minor | Dec 12 2011 12:00:AM |
Effective Monday, December 12th 2011 until May 2012.
Construction will start at the HeliJet entrance, next to the SeaBus concourse at Waterfront Station, in preparation for faregate equipment installation.
Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance.
|
| Edmonds Station:
Temp Ramp Entrance Opens | SkyTrain | Minor | Dec 5 2011 12:00:AM |
Effective Tuesday December 6th, 2011.
The existing main entrance at the Edmonds station will be closed and a new temporary ramp entrance will open next to the main entrance.
Passengers may access the new temporary ramp entrance located across from the pick-up/drop-off area.
Effective Monday November 21st, 2011 until further notice.
Hoarding and modular fencing will go up at Edmonds Station for the start of faregate construction.
Passengers will need to walk around the hoarding to access the existing station entrance. |
| King George Station:
Hoarding Construction | SkyTrain | Minor | Oct 11 2011 12:00:AM |
Effective Wednesday October 12th 2011, until further notice.
Due to construction, hoarding and modular fencing will go up at King George Station.
Passengers will need to walk around the hoarding to access the existing station entrance. |
| 22nd Street Station:
Hoarding Construction | SkyTrain | Minor | Sep 26 2011 12:00:AM |
Effective Monday September 26th until further notice.
Due to construction, hoarding and modular fencing will go up at 22nd Street Station. Passengers will need to walk around the hoarding to access the existing station. |
| Nanaimo Station:
Faregate Construction | SkyTrain | Minor | Sep 12 2011 1:13:PM |
Effective Monday September 12th, 2011 until further notice.
Hoarding and modular fencing are up at Nanaimo Station.
Passengers will need to walk around the hoarding to access the existing station entrance.
Signage has placed around the construction area to direct customers. |
| Patterson Station:
West Entrance Access | SkyTrain | Minor | Sep 9 2011 12:00:AM |
Effective Tueday, October 18th until further notice.
The existing south entrance at Patterson Station will be closed to accommodate faregate construction.
Passengers may enter the station via the existing north entrance (on Central Blvd, elevator accessible) or the temporary west ramp entrance (on Patterson Av).
A temporary widwalk is also in place to redirect passengers around the closed south entrance. |
| Royal Oak Station:
Temporary Entrance | SkyTrain | Minor | Aug 23 2011 10:00:AM |
Effective Tuesday August 23rd, from 10:00am until further notice.
Due to faregate construction, the main entrance at Royal Oak Station will be closed. A temporary entrance will be created to re-route passengers.
Passengers can access the new temporary entrance at the back of Royal Oak Station. |