Status:

Counter-flow schedule: From: 5:30 am – 9 am
3 lanes westbound; 1 lane eastbound
From: 3:30 pm – 6:30 pm
3 lanes eastbound; 1 lane westbound

Pitt River Bridge

The Pitt River Bridge carries Highway 7 (Lougheed Hwy) across the Pitt River, connecting Pitt Meadows and Port Coquitlam.

The Pitt River Bridge is owned by the Ministry of Transportation and maintained by Mainroad Contracting Ltd.

Please note: The traffic cameras for this bridge have been temporarily removed due to construction. The feeds will be re-instated once the cameras are put back in place.